Posts

Showing posts from January, 2019
Image
Entry Trough  Custom Equipment At the end of October, GMB Heavy Industries successfully completed a five-day outage at a bar mill in the United States. The mill was designed with a pneumatically activated separating ledge in the entry trough. This type of drive was proving itself unreliable, as it was adversely affected by both the ambient temperature, and the temperature of the equipment. Consequently, it was impossible to achieve a consistent/repeatable cycle time of less than 0.9 seconds throughout the year for all products. The solution was to replace the pneumatically activated system with an electro-mechanical drive. This system produced a faster cycle time, and also increased reliability. All the equipment for the upgrade was supplied and installed by GMB Heavy industries. Fixed and Moving Rakes Supply At the end of October, GMB Heavy Industries successfully completed a ten-day outage at a medium section mill in the United States. GMB supplied fixed and moving rakes